Level 2 EV Charging, Done the ASI Way

A Level 2 charger replaces a 3-mile-per-hour trickle from a standard outlet with 25 to 40 miles of range per hour, which means you wake up to a full battery without ever visiting a public station. But the install is more than mounting a box on a wall. The charger needs a dedicated 240-volt circuit, the correct breaker, the right wire gauge for the run, and — depending on your panel and amperage — a load calculation to confirm the home can carry the new draw without nuisance tripping.

ASI handles the entire project end to end. Our licensed electricians come to your home, assess your panel, talk through where you actually park, recommend the right hardware, and quote a flat rate that includes the permit. We then run the circuit, mount the charger, terminate the connection, and stay until the unit pairs with your car and your phone app. You drive away the next morning on home-charged power.

ASI Technician
What You Get

A Complete EV Charging Installation

Everything that goes into a clean, code-compliant Level 2 install — included in your flat-rate quote.

Load Calculation

We measure your existing panel capacity against your home's real load before we add a 40-, 48-, or 60-amp circuit, so the charger never trips a breaker and the panel stays safe.

Charger of Your Choice

We install Tesla Wall Connectors, ChargePoint Home Flex, JuiceBox, Wallbox Pulsar, Grizzl-E, Emporia, Enphase, and other Level 2 units — wall-mount or pedestal, hardwired or NEMA 14-50 outlet.

Dedicated Circuit & Conduit

A new dedicated circuit pulled from your panel — typically 50 to 60 amps — with code-compliant wire, conduit where required, and a clean finish on visible runs.

Permit & Inspection

We pull the city or county permit, schedule the inspection, and meet the inspector ourselves so you do not have to. You get the signed-off permit for your records.

Panel Upgrade if Needed

If your existing panel is undersized, full, or a recalled brand, we can quote a panel upgrade as part of the project so the EV install lands on a service that can carry your future load.

Commissioning & App Pairing

Once the unit is energized we run a charge cycle, pair the charger with the manufacturer app, and walk you through how to schedule off-peak charging on your EV utility plan.

The ASI Difference

Why Choose ASI for Your EV Charger

A clean Level 2 install touches your panel, your driveway, and the rebate process. ASI handles all of it so you only have one number to call.

Licensed Electricians

Every EV install is performed by a licensed, insured electrician — not a handyman or a charger reseller subcontracting the wiring.

Flat-Rate, All-In Quote

Your written quote includes the permit, panel work if any, wire, conduit, the charger if we provide it, and labor. No hourly meter and no add-ons after the fact.

Right-Sized for Your EV

We match the circuit and charger to your vehicle's real onboard charger capacity — most cars top out at 32 to 48 amps, and oversizing wastes money on copper you cannot use.

SDG&E Rebate Documentation

We provide the invoice and permit paperwork you need to apply for the SDG&E Power Your Drive program and any other San Diego County EV charger rebates.

Iron-Clad Guarantees

Parts and labor are backed by comprehensive warranties. If anything is not right, we make it right.

Serving San Diego Since 1952

Seven decades of electrical experience in San Diego County means our team knows your local utility, your panel brands, and your permitting jurisdiction.

ASI Hastings service truck
Our Process

How Your EV Charger Install Works

Most San Diego installs are completed in a single day.

1. Free In-Home Assessment

An electrician visits, checks your panel, looks at where you park, measures the wire run, and recommends the right charger and circuit size.

2. Flat-Rate Quote & Permit

You get a written, all-in quote. Once you approve, we pull the city or county permit on your behalf.

3. Installation Day

We run the circuit from your panel, mount the charger or NEMA 14-50 outlet, and clean up the work area. Most installs finish in a single visit.

4. Inspection & Sign-Off

We meet the inspector, finalize the permit, and hand you the signed paperwork and rebate documentation along with a quick walkthrough on charging.

Ready to Get Started?

Schedule your service today and experience the White Glove difference.

Customer Reviews

What Our Customers Say

Don't just take our word for it — hear from our satisfied San Diego customers.

FAQ

EV Charger Installation Questions Answered

A straightforward Level 2 installation in a San Diego home typically runs between $1,200 and $2,800 installed, depending on the run length from the panel to the charger location, whether conduit is exposed, and whether your existing panel has capacity. Installs that require a panel upgrade run more. ASI gives you a flat-rate, all-in price before any work begins.

Either works. We can source and install most major Level 2 brands, or we can install a unit you have already purchased — including a Tesla Wall Connector that came with your vehicle.

Yes, in nearly every San Diego County jurisdiction. Permits protect you (and your insurance) and are required by utility rebate programs. ASI pulls the permit and meets the inspector as part of the install.

Many San Diego homes built before 1990 have 100-amp service and a panel that is already close to full. Adding a 40- to 60-amp EV circuit on top of A/C, an electric range, and a heat pump can push the load past code limits. We do a load calculation on the visit and tell you honestly whether a panel upgrade is needed.

A hardwired Level 2 charger is the cleaner, longer-lived option for most homeowners — it can be sized up to 48 amps for faster charging and is less exposed to outlet wear. A NEMA 14-50 outlet caps at 32 amps of continuous charging and is the right pick if you plan to move the charger with you. We will recommend the option that fits your car and your home.

Yes. SDG&E’s Power Your Drive program and California Clean Fuel Reward have offered EV charger rebates and per-kilowatt-hour credits at different times. We provide the invoice, permit, and inspection documentation you need to apply. Programs change, so we recommend confirming current eligibility before the install.

Schedule EV Charger Installation

Ready to Charge at Home?

Stop hunting for public chargers. Our licensed electricians install Level 2 chargers across San Diego County — quoted, permitted, and inspected.

Same-Day & Emergency Service Nights and Weekends Never an Extra Charge
All Major Brands Installed
Permit & Inspection Included
Flat-Rate, All-In Pricing
SDG&E Rebate Documentation
Call Now Book Now
×